Bitfury
Bitfury is an operational data center in Zahesi, Georgia. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.7 MW (range 2.4 MW to 7.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,957 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.80825, 44.86278 |
Power and grid
| Grid carbon intensity | 142 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 74.8%, gas 19.4%, solar 5.2%, wind 0.6%. Clean power: 80.6% |
| Industrial power price | EUR 0.000 per kWh (Georgia, 2025-S2) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Mtskheta-Mtianeti) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bitfury use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Bitfury?
The grid in Georgia emits about 142 g CO₂ per kWh (2025). Largest sources: hydro 74.8%, gas 19.4%, solar 5.2%.
Data centers near Zahesi
- Caucasus Online Datacenter - Tbilisi 9.4 km
- Cloud9 Dinamo Arena 11.3 km
- Newtelco Datacenter 15.8 km
- NewTelco Tbilisi 16.0 km