Newtelco Datacenter is an operational data center in Tsqnet’i, Georgia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | ანა პოლიტკოვსკაიას ქუჩა |
| Coordinates | 41.72107, 44.71271 |
Power and grid
| Nearest high-voltage substation | საბურთალო-2, 110 kV, 400 m away (სს "თელასი") Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ლისი-220, 220 kV, 3.8 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.5 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 142 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 74.8%, gas 19.4%, solar 5.2%, wind 0.6%. Clean power: 80.6% |
| Industrial power price | EUR 0.000 per kWh (Georgia, 2025-S2) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 318 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Kvemo Kartli) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Newtelco Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is საბურთალო-2 (110 kV), about 400 m away.
How clean is the power for Newtelco Datacenter?
The grid in Georgia emits about 142 g CO₂ per kWh (2025). Largest sources: hydro 74.8%, gas 19.4%, solar 5.2%.
Data centers near Tsqnet’i
- NewTelco Tbilisi 266 m
- Cloud9 Dinamo Arena 6.2 km
- Caucasus Online Datacenter - Tbilisi 11.9 km
- Bitfury 15.8 km · 4.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.