Bund data center in Frauenfeld
Bund data center in Frauenfeld is an operational data center operated by Bund in Frauenfeld, Switzerland. Our footprint estimate of its power is about 7.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bund |
| Facility power | 7.6 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,318 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | RZ CAMPUS |
| Coordinates | 47.57138, 8.88837 |
Power and grid
| Nearest high-voltage substation | Unterwerk Frauenfeld West, 110 kV, 1 km away (EKT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unterwerk Wittenwil, 220 kV, 8.8 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 1.4 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Thurgau) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bund data center in Frauenfeld use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
How close is Bund data center in Frauenfeld to the power grid?
The nearest high-voltage substation in OpenStreetMap is Unterwerk Frauenfeld West (110 kV), about 1 km away.
How clean is the power for Bund data center in Frauenfeld?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Bund data center in Frauenfeld?
Bund.
Data centers near Frauenfeld
- Datacenter Thurgau 997 m
- ZRH1 12.4 km · 4 MW
- Internet Group AG Datacenter 3 12.5 km
- Rechenzentrum Winterthur 13.2 km
- NorthC Winterthur (Zürich) 14.3 km
- AXA Data Center 14.8 km
- DataCenter Winterthur 15.0 km
- Hegau Cloud 21.0 km
Sources