Datacenter Thurgau
Datacenter Thurgau is an operational data center operated by EKT in Frauenfeld, Switzerland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EKT |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Address | Galgenholzstrasse 23 |
| Coordinates | 47.56243, 8.88767 |
| Website | datacenterthurgau.ch |
Power and grid
| Nearest high-voltage substation | Unterwerk Frauenfeld West, 110 kV, 0 m away (EKT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unterwerk Wittenwil, 220 kV, 7.9 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 1.4 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Thurgau) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Datacenter Thurgau to the power grid?
The nearest high-voltage substation in OpenStreetMap is Unterwerk Frauenfeld West (110 kV), about 0 m away.
How clean is the power for Datacenter Thurgau?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Datacenter Thurgau?
EKT.
Data centers near Frauenfeld
- Bund data center in Frauenfeld 997 m · 7.6 MW
- ZRH1 11.7 km · 4 MW
- Internet Group AG Datacenter 3 11.8 km
- Rechenzentrum Winterthur 12.5 km
- NorthC Winterthur (Zürich) 13.7 km
- AXA Data Center 14.3 km
- DataCenter Winterthur 14.5 km
- Hegau Cloud 22.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.