Calcul Québec Narval

Calcul Québec Narval is an operational AI data center operated by Compute Canada in Ville-Marie, Canada. Its power is about 0.5 MW. Epoch AI estimates about 201 H100-equivalent AI chips (NVIDIA V100, NVIDIA A100).

Key facts

StatusOperational
OperatorCompute Canada
Facility power0.5 MW
Reported (Epoch AI or owner data)
AI compute201 H100-equivalents
AI chipsNVIDIA V100, NVIDIA A100
Reported (Epoch AI or owner data)
Chip count688
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 230 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address1100 Notre-Dame St W, Montreal, Quebec H3C 1K3, Canada
Coordinates45.49495, -73.56285

Power and grid

Nearest high-voltage substationPoste Adélard-Godbout, 120 kV, 600 m away (Hydro-Québec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPoste Guy, 315 kV, 800 m away
HV substations within 10 km26
Power plants within 50 km2.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature6.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.6 °C (2001 to 2025)
Cooling degree days272 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.54 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow - Medium (10-20%) (Canada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Calcul Québec BélugaNVIDIA V1006880.4 MW2019-04-26
Calcul Québec NarvalNVIDIA A1006360.5 MW2021-11-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Calcul Québec Narval use?

Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).

What chips does Calcul Québec Narval use?

Reported chips: NVIDIA V100, NVIDIA A100.

How close is Calcul Québec Narval to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste Adélard-Godbout (120 kV), about 600 m away.

How clean is the power for Calcul Québec Narval?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Calcul Québec Narval?

Compute Canada.