Calcul Québec Narval
Calcul Québec Narval is an operational AI data center operated by Compute Canada in Ville-Marie, Canada. Its power is about 0.5 MW. Epoch AI estimates about 201 H100-equivalent AI chips (NVIDIA V100, NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Compute Canada |
| Facility power | 0.5 MW Reported (Epoch AI or owner data) |
| AI compute | 201 H100-equivalents |
| AI chips | NVIDIA V100, NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 688 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 230 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 1100 Notre-Dame St W, Montreal, Quebec H3C 1K3, Canada |
| Coordinates | 45.49495, -73.56285 |
Power and grid
| Nearest high-voltage substation | Poste Adélard-Godbout, 120 kV, 600 m away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Poste Guy, 315 kV, 800 m away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 2.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 272 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Calcul Québec Béluga | NVIDIA V100 | 688 | 0.4 MW | 2019-04-26 |
| Calcul Québec Narval | NVIDIA A100 | 636 | 0.5 MW | 2021-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Calcul Québec Narval use?
Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).
What chips does Calcul Québec Narval use?
Reported chips: NVIDIA V100, NVIDIA A100.
How close is Calcul Québec Narval to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste Adélard-Godbout (120 kV), about 600 m away.
How clean is the power for Calcul Québec Narval?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Calcul Québec Narval?
Compute Canada.
Data centers near Ville-Marie
- Data center in Ville-Marie 257 m · 34 MW
- Cologix MTL11 460 m
- 740 Notre-Dame West Montreal 533 m
- Netelligent-1 619 m
- Cologix MTL3 644 m
- eStruxture MTL-1 721 m
- Aptum MTL1 849 m
- Cologix MTL7 908 m
More Compute Canada data centers
Sources