Simon Fraser University/Compute Canada Cedar

Simon Fraser University/Compute Canada Cedar is an operational AI data center operated by Compute Canada in Burnaby, Canada. Its power is about 0.6 MW. Epoch AI estimates about 49 H100-equivalent AI chips (NVIDIA V100).

Key facts

StatusOperational
OperatorCompute Canada
Facility power0.6 MW
Reported (Epoch AI or owner data)
AI compute49 H100-equivalents
AI chipsNVIDIA V100
Reported (Epoch AI or owner data)
Chip count768
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 240 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address8888 University Dr W, Burnaby, BC V5A 1S6, Canada
Coordinates49.27673, -122.91423

Power and grid

Nearest high-voltage substationBarnard Substation, 230 kV, 1.9 km away (BC Hydro)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
UtilityBc Hydro (federal)
Electric retail service territory (HIFLD, US government).
Power plants within 50 km500 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.8 °C (2001 to 2025)
Cooling degree days41 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.22 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (British Columbia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Simon Fraser University/Compute Canada CedarNVIDIA V1007680.6 MW2020-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Simon Fraser University/Compute Canada Cedar use?

Public data puts the facility power at about 0.6 MW. Reported (Epoch AI or owner data).

What chips does Simon Fraser University/Compute Canada Cedar use?

Reported chips: NVIDIA V100.

How close is Simon Fraser University/Compute Canada Cedar to the power grid?

The nearest high-voltage substation in OpenStreetMap is Barnard Substation (230 kV), about 1.9 km away. The local utility is Bc Hydro.

How clean is the power for Simon Fraser University/Compute Canada Cedar?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Simon Fraser University/Compute Canada Cedar?

Compute Canada.