Simon Fraser University/Compute Canada Cedar
Simon Fraser University/Compute Canada Cedar is an operational AI data center operated by Compute Canada in Burnaby, Canada. Its power is about 0.6 MW. Epoch AI estimates about 49 H100-equivalent AI chips (NVIDIA V100).
Key facts
| Status | Operational |
|---|---|
| Operator | Compute Canada |
| Facility power | 0.6 MW Reported (Epoch AI or owner data) |
| AI compute | 49 H100-equivalents |
| AI chips | NVIDIA V100 Reported (Epoch AI or owner data) |
| Chip count | 768 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 240 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 8888 University Dr W, Burnaby, BC V5A 1S6, Canada |
| Coordinates | 49.27673, -122.91423 |
Power and grid
| Nearest high-voltage substation | Barnard Substation, 230 kV, 1.9 km away (BC Hydro) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | Bc Hydro (federal) Electric retail service territory (HIFLD, US government). |
| Power plants within 50 km | 500 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 41 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.22 kWh per m² per day |
| Wind at 50 m | 2.6 m/s average |
| Water stress today | Low (<10%) (British Columbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Simon Fraser University/Compute Canada Cedar | NVIDIA V100 | 768 | 0.6 MW | 2020-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Simon Fraser University/Compute Canada Cedar use?
Public data puts the facility power at about 0.6 MW. Reported (Epoch AI or owner data).
What chips does Simon Fraser University/Compute Canada Cedar use?
Reported chips: NVIDIA V100.
How close is Simon Fraser University/Compute Canada Cedar to the power grid?
The nearest high-voltage substation in OpenStreetMap is Barnard Substation (230 kV), about 1.9 km away. The local utility is Bc Hydro.
How clean is the power for Simon Fraser University/Compute Canada Cedar?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Simon Fraser University/Compute Canada Cedar?
Compute Canada.
Data centers near Burnaby
- Data center in Burnaby 294 m
- eStruxture VAN-3 6.5 km
- Equinix VA1 - Vancouver 7.2 km
- Tech Futures YVR1 8.6 km · 4.6 MW
- eStruxture VAN-1 13.8 km
- Cologix VAN4 14.1 km
- Harbour Centre Vancouver 14.4 km
- PureColo VAN01 (Vancouver) 14.6 km
More Compute Canada data centers
- Calcul Québec Narval Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.