Equinix VA1 - Vancouver
Equinix VA1 - Vancouver is an operational data center operated by Equinix in Burnaby, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 2 networks PeeringDB. |
| Also known as | Equinix VA1 |
| Address | 4185 Still Creek Drive |
| Coordinates | 49.26041, -123.01094 |
| Website | equinix.com/locations/americas-colocation/canada-colocation/vancouver-data-centers/va1 |
Power and grid
| Nearest high-voltage substation | Horne Payne Substation, 230 kV, 800 m away (BC Hydro) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Utility | Bc Hydro (federal) Electric retail service territory (HIFLD, US government). |
| Power plants within 50 km | 271 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 41 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.22 kWh per m² per day |
| Wind at 50 m | 2.6 m/s average |
| Water stress today | Low (<10%) (British Columbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix VA1 - Vancouver to the power grid?
The nearest high-voltage substation in OpenStreetMap is Horne Payne Substation (230 kV), about 800 m away. The local utility is Bc Hydro.
How clean is the power for Equinix VA1 - Vancouver?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Equinix VA1 - Vancouver?
Equinix.
Data centers near Burnaby
- eStruxture VAN-3 1.2 km
- Tech Futures YVR1 1.4 km · 4.6 MW
- eStruxture VAN-1 6.8 km
- Simon Fraser University/Compute Canada Cedar 7.2 km · 0.6 MW
- Data center in Burnaby 7.3 km
- Cologix VAN4 7.5 km
- Harbour Centre Vancouver 7.8 km
- PureColo VAN01 (Vancouver) 8.2 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.