Data Center Directory

Tech Futures YVR1

Tech Futures YVR1 is an operational data center operated by Tech Futures Interactive in Vancouver, Canada. Our footprint estimate of its power is about 4.6 MW.

Key facts

StatusOperational
OperatorTech Futures Interactive
Facility power4.6 MW (range 2.3 MW to 7.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,927 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks32 networks, 4 internet exchanges
PeeringDB.
Also known asCologix VAN3 · VAN3
Address2828 Natal Street
Coordinates49.25939, -123.02962
Websitetechfutures.xyz

Power and grid

Nearest high-voltage substationHorne Payne Substation, 230 kV, 1.2 km away (BC Hydro)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km14
UtilityBc Hydro (federal)
Electric retail service territory (HIFLD, US government).
Power plants within 50 km271 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.8 °C (2001 to 2025)
Cooling degree days41 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.22 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (British Columbia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Tech Futures YVR1 use?

We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.

How close is Tech Futures YVR1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Horne Payne Substation (230 kV), about 1.2 km away. The local utility is Bc Hydro.

How clean is the power for Tech Futures YVR1?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Tech Futures YVR1?

Tech Futures Interactive.