eStruxture VAN-3
eStruxture VAN-3 is an operational data center operated by eStruxture Data Centers in Burnaby, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | eStruxture Data Centers |
| Networks | 1 networks, 2 internet exchanges PeeringDB. |
| Address | 4590 Canada Way |
| Coordinates | 49.25431, -122.99724 |
| Website | estruxture.com/data-centers/vancouver/van-3 |
Power and grid
| Nearest high-voltage substation | Horne Payne Substation, 230 kV, 2 km away (BC Hydro) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Utility | Bc Hydro (federal) Electric retail service territory (HIFLD, US government). |
| Power plants within 50 km | 467 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 41 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.22 kWh per m² per day |
| Wind at 50 m | 2.6 m/s average |
| Water stress today | Low (<10%) (British Columbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is eStruxture VAN-3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Horne Payne Substation (230 kV), about 2 km away. The local utility is Bc Hydro.
How clean is the power for eStruxture VAN-3?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates eStruxture VAN-3?
eStruxture Data Centers.
Data centers near Burnaby
- Equinix VA1 - Vancouver 1.2 km
- Tech Futures YVR1 2.4 km · 4.6 MW
- Simon Fraser University/Compute Canada Cedar 6.5 km · 0.6 MW
- Data center in Burnaby 6.6 km
- eStruxture VAN-1 7.8 km
- Cologix VAN4 8.7 km
- Harbour Centre Vancouver 9.0 km
- PureColo VAN01 (Vancouver) 9.3 km
More eStruxture Data Centers data centers
- eStruxture TOR-5 Canada
- eStruxture CAL-1 Canada
- eStruxture CAL-2 Canada
- eStruxture MTL-1 Canada
- eStruxture MTL-2 Canada
- eStruxture MTL-3 Canada
- eStruxture TOR-2 Canada
- eStruxture TOR-3 Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.