eStruxture CAL-2
eStruxture CAL-2 is an operational data center operated by eStruxture Data Centers in Rocky View, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | eStruxture Data Centers |
| Networks | 3 networks PeeringDB. |
| Also known as | eStruxture CAL-3 |
| Address | 149 High Plains Pl |
| Coordinates | 51.20144, -113.93294 |
| Website | estruxture.com/data-centers/calgary/cal-2 |
Power and grid
| Nearest high-voltage substation | Substation 162, 240 kV, 2.5 km away (ENMAX) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Utility | Fortisalberta (investor owned) Electric retail service territory (HIFLD, US government). |
| Power plants within 50 km | 1.7 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 4.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37 °C (2001 to 2025) |
| Cooling degree days | 65 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Medium - High (20-40%) (Alberta) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is eStruxture CAL-2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Substation 162 (240 kV), about 2.5 km away. The local utility is Fortisalberta.
How clean is the power for eStruxture CAL-2?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates eStruxture CAL-2?
eStruxture Data Centers.
Data centers near Rocky View
- Data center in Airdrie 11.7 km · 13 MW
- Rogers Calgary DC3 (Airdrie) 11.9 km
- Arrow Calgary DC2 13.5 km
- Rogers Calgary DC1 (Franklin Atrium) 16.7 km
- Equinix CL2 - Calgary 17.9 km
- City of Calgary - City Hall 19.4 km
- Hanover Building Calgary 19.4 km
- University of Calgary 19.6 km
More eStruxture Data Centers data centers
- eStruxture TOR-5 Canada
- eStruxture CAL-1 Canada
- eStruxture MTL-1 Canada
- eStruxture MTL-2 Canada
- eStruxture MTL-3 Canada
- eStruxture TOR-2 Canada
- eStruxture TOR-3 Canada
- eStruxture TOR-4 Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.