Data Center Directory

CANTV Alta Vista

CANTV Alta Vista is an operational data center operated by CANTV in Ciudad Guayana (Puerto Ordaz), Venezuela. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
OperatorCANTV
Facility power1 MW (range 0.5 MW to 1.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 875 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCalle Aro, Ciudad Guayana (Puerto Ordaz)
Coordinates8.29300, -62.73001

Power and grid

Nearest high-voltage substationSubestación "Macagua III" 115 Kv. CORPOELEC, 115 kV, 5.6 km away (Corpoelec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación "Macagua II" 400 Kv. (3x300 MVA) CORPOELEC, 400 kV, 7.8 km away
HV substations within 10 km6
Power plants within 50 km5.1 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity86 g CO₂ per kWh (Venezuela, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 91.1%, gas 4.5%, oil and other fossil 4.4%. Clean power: 91.1%

Climate and water

Average temperature27.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days3,580 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.21 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Venezuela)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CANTV Alta Vista use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How close is CANTV Alta Vista to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación "Macagua III" 115 Kv. CORPOELEC (115 kV), about 5.6 km away.

How clean is the power for CANTV Alta Vista?

The grid in Venezuela emits about 86 g CO₂ per kWh (2024). Largest sources: hydro 91.1%, gas 4.5%, oil and other fossil 4.4%.

Who operates CANTV Alta Vista?

CANTV.

Data centers near Ciudad Guayana (Puerto Ordaz)

More CANTV data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.