Datacenter de Movistar is an operational data center operated by Movistar in Ciudad Guayana, Venezuela. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorMovistar
Coordinates8.29788, -62.72719

Power and grid

Nearest high-voltage substationSubestación "Macagua III" 115 Kv. CORPOELEC, 115 kV, 5.2 km away (Corpoelec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación "Macagua II" 400 Kv. (3x300 MVA) CORPOELEC, 400 kV, 7.4 km away
HV substations within 10 km6
Power plants within 50 km5.1 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity86 g CO₂ per kWh (Venezuela, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 91.1%, gas 4.5%, oil and other fossil 4.4%. Clean power: 91.1%

Climate and water

Average temperature27.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days3,580 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.21 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Venezuela)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Datacenter de Movistar to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación "Macagua III" 115 Kv. CORPOELEC (115 kV), about 5.2 km away.

How clean is the power for Datacenter de Movistar?

The grid in Venezuela emits about 86 g CO₂ per kWh (2024). Largest sources: hydro 91.1%, gas 4.5%, oil and other fossil 4.4%.

Who operates Datacenter de Movistar?

Movistar.

Data centers near Ciudad Guayana

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.