Centro de datos Terranova
Centro de datos Terranova is an operational data center in San Miguel de Allende, Mexico. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.2 MW (range 0.9 MW to 5.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,634 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.90991, -100.61847 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.8 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Santa fe, 230 kV, 4 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.3 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 16.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 360 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.77 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Extremely High (>80%) (Guanajuato) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Terranova use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
How close is Centro de datos Terranova to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.8 km away.
How clean is the power for Centro de datos Terranova?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Data centers near San Miguel de Allende
- Centro de datos ODATA QR04 436 m · 10 MW
- Alibaba Cloud in Mexico 27.2 km
- EdgeUno Datacenter Queretaro Mexico (QRO2) 40.4 km
- Centro de datos Triara Querétaro 40.6 km · 18 MW
- EdgeUno Datacenter Mexico (QRO2) 40.6 km
- Centro de datos ODATA QR02 41.1 km · 7.1 MW
- Ascenty QRO02 - Querétaro 41.4 km
- RedIT Queretaro 47.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.