Centro de Procesamiento de Datos del Gobierno de Cantabria is an operational data center operated by Gobienro de Cantabria in Santander, Spain. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
OperatorGobienro de Cantabria
Facility power0.9 MW (range 0.5 MW to 1.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 771 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressPaseo de Altamira 81A, 39006, Santander
Coordinates43.46617, -3.81415

Power and grid

Nearest high-voltage substationSubestación eléctrica Global Steel Wire Nueva Montaña, 220 kV, 3.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km458 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature14.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.6 °C (2001 to 2025)
Cooling degree days241 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.62 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayMedium - High (20-40%) (Cantabria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centro de Procesamiento de Datos del Gobierno de Cantabria use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is Centro de Procesamiento de Datos del Gobierno de Cantabria to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación eléctrica Global Steel Wire Nueva Montaña (220 kV), about 3.8 km away.

How clean is the power for Centro de Procesamiento de Datos del Gobierno de Cantabria?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Centro de Procesamiento de Datos del Gobierno de Cantabria?

Gobienro de Cantabria.

Data centers near Santander

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.