Centro de Procesamiento de Datos Norte
Centro de Procesamiento de Datos Norte is an operational data center operated by Banco Santander in El Astillero, Spain. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Banco Santander |
| Facility power | 12 MW (range 5.8 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,700 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.39284, -3.75323 |
Power and grid
| Nearest high-voltage substation | Subestación del Astillero, 220 kV, 6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 458 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.6 °C (2001 to 2025) |
| Cooling degree days | 241 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Medium - High (20-40%) (Cantabria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de Procesamiento de Datos Norte use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Centro de Procesamiento de Datos Norte to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación del Astillero (220 kV), about 6 km away.
How clean is the power for Centro de Procesamiento de Datos Norte?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Centro de Procesamiento de Datos Norte?
Banco Santander.
Data centers near El Astillero
- Centro de Procesamiento de Datos Sur 291 m · 7.3 MW
- Centro de Procesamiento de Datos del Gobierno de Cantabria 9.5 km · 0.9 MW
More Banco Santander data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.