China Mobile International - GIC Hong Kong
China Mobile International - GIC Hong Kong is an operational data center operated by China Mobile International in Hong Kong SAR, Hong Kong SAR China. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | China Mobile International |
| AI chips | Huawei Ascend and NVIDIA China-market GPUs Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips. |
| Networks | 2 networks PeeringDB. |
| Address | 15 Tsung Tau Ha Road,, Fo Tan, N.T. |
| Coordinates | 22.39999, 114.19455 |
| Website | isolutions.cmi.chinamobile.com/en/product/data-center/global-intelligence-center |
Power and grid
| Nearest high-voltage substation | 沙田400仟伏變電站 Shatin 400kV Substation, 400 kV, 3.7 km away (中華電力有限公司 CLP Power Hong Kong Limited) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 25 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 673 g CO₂ per kWh (Hong Kong SAR China, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 63.8%, coal 33.5%, oil and other fossil 1.2%, solar 1%. Clean power: 1.5% |
Climate and water
| Average temperature | 23.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 2,136 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.14 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does China Mobile International - GIC Hong Kong use?
No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.
How close is China Mobile International - GIC Hong Kong to the power grid?
The nearest high-voltage substation in OpenStreetMap is 沙田400仟伏變電站 Shatin 400kV Substation (400 kV), about 3.7 km away.
How clean is the power for China Mobile International - GIC Hong Kong?
The grid in Hong Kong SAR China emits about 673 g CO₂ per kWh (2024). Largest sources: gas 63.8%, coal 33.5%, oil and other fossil 1.2%.
Who operates China Mobile International - GIC Hong Kong?
China Mobile International.
Data centers near Hong Kong SAR
- MEGA Two (iAdvantage Hong Kong) 476 m
- Asia Tone Hongkong (DC1) 1.7 km
- Corporation-Park 1.8 km
- SunNetwork DataCenter (HK2) 2.1 km
- CUHK 2.5 km
- AsiaSat 5.9 km
- iTech Towers 2 7.0 km
- HKBN Edwick Industrial Centre 7.0 km
More China Mobile International data centers
- China Mobile International - GNC Hong Kong Hong Kong SAR China
- China Mobile International - Singapore DC Singapore
- China Mobile International - London DC United Kingdom
- China Mobile International - Data Zone Data Center (Thailand) Thailand
- China Mobile International - Frankfurt DC Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.