Cirion Centro de Datos LIM2
Cirion Centro de Datos LIM2 is an operational data center in Villa Poeta José Gálvez Barrenechea, Peru. Our footprint estimate of its power is about 6.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,372 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -12.25807, -76.82584 |
Power and grid
| Nearest high-voltage substation | S.E. San Juan, 220 kV, 18.4 km away (Red de Energía del Peru) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 4.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 235 g CO₂ per kWh (Peru, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 55.2%, gas 35.6%, solar 4.4%, wind 3.5%, bioenergy 1.1%. Clean power: 64.1% |
Climate and water
| Average temperature | 18.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.7 °C (2001 to 2025) |
| Cooling degree days | 396 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.59 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Peru) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cirion Centro de Datos LIM2 use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
How close is Cirion Centro de Datos LIM2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is S.E. San Juan (220 kV), about 18.4 km away.
How clean is the power for Cirion Centro de Datos LIM2?
The grid in Peru emits about 235 g CO₂ per kWh (2025). Largest sources: hydro 55.2%, gas 35.6%, solar 4.4%.
Data centers near Villa Poeta José Gálvez Barrenechea
- GTD Centro de Datos Lurín 164 m · 2.2 MW
- Telxius Lima DC 5.0 km
- America Movil Telepuerto VES 15.7 km
- Internexa Lima San Juan 18.4 km
- GTD Peru Data Center 22.1 km
- Cirion Lima - LIM1 24.2 km
- EdgeUno Datacenter Lima Peru (LIM1) 24.7 km
- Internexa Lima Surco 24.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.