GTD Centro de Datos Lurín

GTD Centro de Datos Lurín is an operational data center in Villa Poeta José Gálvez Barrenechea, Peru. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusOperational
Facility power2.2 MW (range 1.1 MW to 3.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,870 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-12.25781, -76.82435

Power and grid

Nearest high-voltage substationS.E. San Juan, 220 kV, 18.5 km away (Red de Energía del Peru)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km4.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity235 g CO₂ per kWh (Peru, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 55.2%, gas 35.6%, solar 4.4%, wind 3.5%, bioenergy 1.1%. Clean power: 64.1%

Climate and water

Average temperature18.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature25.7 °C (2001 to 2025)
Cooling degree days396 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.59 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayHigh (40-80%) (Peru)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does GTD Centro de Datos Lurín use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

How close is GTD Centro de Datos Lurín to the power grid?

The nearest high-voltage substation in OpenStreetMap is S.E. San Juan (220 kV), about 18.5 km away.

How clean is the power for GTD Centro de Datos Lurín?

The grid in Peru emits about 235 g CO₂ per kWh (2025). Largest sources: hydro 55.2%, gas 35.6%, solar 4.4%.