CIV Anzin
CIV Anzin is an operational data center in Anzin, France. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.5 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,110 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenue Augusta Ada-King 486, 59410, Anzin |
| Coordinates | 50.37830, 3.52208 |
| Website | civ.fr |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 71 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Hauts-de-France) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CIV Anzin use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How clean is the power for CIV Anzin?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Anzin
- ETIX Lille #3 236 m
- Firstheberg 908 m
- Techcrea Valenciennes 4.0 km
- Data center in Quaregnon 25.8 km · 24 MW
- Data center in Quaregnon 25.9 km · 21 MW
- Data center in Quaregnon 26.2 km · 24 MW
- Google Data Center 26.2 km · 134 MW
- Bouygues Télécom data center in Waziers 29.9 km · 0.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.