Data center in Quaregnon
Data center in Quaregnon is an operational data center in Quaregnon, Belgium. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 24 MW (range 12 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,874 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2019 |
| Coordinates | 50.46434, 3.86586 |
Power and grid
| Nearest high-voltage substation | 150kV Petit Marais, 150 kV, 700 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Poste électrique de Estreux, 225 kV, 21.6 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 3.2 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 71 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.04 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Quaregnon use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Data center in Quaregnon to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150kV Petit Marais (150 kV), about 700 m away.
How clean is the power for Data center in Quaregnon?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Data centers near Quaregnon
- Data center in Quaregnon 352 m · 21 MW
- Google Data Center 384 m · 134 MW
- Data center in Quaregnon 387 m · 24 MW
- ETIX Lille #3 26.2 km
- CIV Anzin 26.2 km · 2.5 MW
- Techcrea Valenciennes 26.4 km
- Firstheberg 26.5 km
- LCL Brussels South 43.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.