Claro
Claro is an operational data center in Capilla del Monte, Argentina. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | -30.86675, -64.51964 |
Power and grid
| Power plants within 50 km | 2 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
|---|---|
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 15.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.2 °C (2001 to 2025) |
| Cooling degree days | 453 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.09 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Argentina) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Claro?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Data centers near Capilla del Monte
- Data center in La Cumbre 8.2 km
- Data center in La Cumbre 12.9 km
- TeraSoft 14.7 km
- Telecom 25.5 km · 1.1 MW
- Data center in Valle Hermoso 26.8 km
- Edificio de Telecomunicaciones 61.5 km
- Cirion Cordoba - COR1 72.8 km