Telecom

Telecom is an operational data center in La Falda, Argentina. Our footprint estimate of its power is about 1.1 MW.

Key facts

StatusOperational
Facility power1.1 MW (range 0.6 MW to 1.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 941 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-31.09453, -64.48712

Power and grid

Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Water stress todayLow - Medium (10-20%) (Argentina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Telecom use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Telecom?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.