Data Center Directory

Claro SJU-01

Claro SJU-01 is an operational data center operated by Claro-PRTC in San Juan, Puerto Rico. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorClaro-PRTC
AddressMario Julia Industrial Park 390 Calle A
Coordinates18.41572, -66.09719
Websiteclarotodo.com

Power and grid

Nearest high-voltage substationSubestación Bayamón, 230 kV, 5 km away (Puerto Rico Electric Power Authority)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km1.8 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity642 g CO₂ per kWh (Puerto Rico, 2025)
Average of all power made in the area. Ember.
Grid power mixoil and other fossil 47.8%, gas 28.8%, coal 15.3%, solar 6.9%, wind 1.1%. Clean power: 8.1%

Climate and water

Average temperature26.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.7 °C (2001 to 2025)
Cooling degree days3,211 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.53 kWh per m² per day
Wind at 50 m6 m/s average

Satellite view

Questions

How close is Claro SJU-01 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Bayamón (230 kV), about 5 km away.

How clean is the power for Claro SJU-01?

The grid in Puerto Rico emits about 642 g CO₂ per kWh (2025). Largest sources: oil and other fossil 47.8%, gas 28.8%, coal 15.3%.

Who operates Claro SJU-01?

Claro-PRTC.

Data centers near San Juan

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.