HRCOM
HRCOM is an operational data center operated by HRcom in Guaynabo, Puerto Rico. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | HRcom |
| Networks | 17 networks, 1 internet exchanges PeeringDB. |
| Also known as | FiberX Data Center |
| Address | Metro Office Park Street #1 Lot 6 |
| Coordinates | 18.41642, -66.10554 |
| Website | hrcompr.com |
Power and grid
| Grid carbon intensity | 642 g CO₂ per kWh (Puerto Rico, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | oil and other fossil 47.8%, gas 28.8%, coal 15.3%, solar 6.9%, wind 1.1%. Clean power: 8.1% |
Climate and water
| Average temperature | 26.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.7 °C (2001 to 2025) |
| Cooling degree days | 3,211 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.53 kWh per m² per day |
| Wind at 50 m | 6 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for HRCOM?
The grid in Puerto Rico emits about 642 g CO₂ per kWh (2025). Largest sources: oil and other fossil 47.8%, gas 28.8%, coal 15.3%.
Who operates HRCOM?
HRcom.
Data centers near Guaynabo
- Neptuno Data Center 248 m
- Microsoft 381 m
- Claro SJU-01 884 m
- Claro Puerto Rico 2.8 km
- Critical Hub DataCenter 5.1 km
- EdgeUno Datacenter San Juan Puerto Rico (SJU1) 5.2 km
- NetWave PR 5.5 km
- Fusetelecom Data Center 5.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.