Data Center Directory

CloudDC

CloudDC is an operational data center operated by ООО ИК "Сибинтек" in Zelenograd, Russia. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
OperatorООО ИК "Сибинтек"
Facility power3.3 MW (range 1.3 MW to 8.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 27,109 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates56.00968, 37.14911

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CloudDC use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How clean is the power for CloudDC?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Who operates CloudDC?

ООО ИК "Сибинтек".

Data centers near Zelenograd

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.