Cogent Buffalo
Cogent Buffalo is an operational data center operated by Cogent Communications in Buffalo, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Address | 271 Bristol Street |
| Coordinates | 42.88123, -78.84659 |
| Website | cogentco.com/en/cogent-buffalo |
Power and grid
| Utility | Niagara Mohawk Power Corp. (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NYIS |
| Nearest gas pipeline | National Fuel Gas Distr Co, intrastate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 347 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.59 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Cogent Buffalo?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Cogent Buffalo?
Cogent Communications.
Data centers near Buffalo
- ixColo 2.4 km
- 325 Delaware Ave 2.7 km
- Victory Technology Center 6.4 km
- Frontier Science 12.4 km
- I-Evolve Technology Datacenter Amherst 16.0 km
- Data center in Getzville 19.9 km · 5.3 MW
- Blockfusion data center in Niagara Falls 23.0 km · 2.4 MW
- Blockfusion Niagra Falls 25.8 km · 1.8 MW
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.