Data Center Directory

Condor Galaxy 1 (CG-1)

Condor Galaxy 1 (CG-1) is an operational AI data center operated by G42,Cerebras Systems in Santa Clara, United States. Our footprint estimate of its power is about 2.2 MW. Epoch AI estimates about 243 H100-equivalent AI chips (Cerebras CS-2).

Key facts

StatusOperational
OperatorG42,Cerebras Systems
Facility power2.2 MW (range 1.1 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,818 m² building outline x 1 floor(s) x 1.2 kW/m².
AI compute243 H100-equivalents
AI chipsCerebras CS-2
Reported (Epoch AI or owner data)
Chip count64
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asColovore
AddressColovore LLC Data Center 1101 Space Park Dr, Santa Clara, CA 95054
Coordinates37.37667, -121.95316

Power and grid

Nearest high-voltage substationScott Receiving Station, 115 kV, 100 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorthern Receiving Station, 230 kV, 3 km away
HV substations within 10 km24
UtilityCity Of Santa Clara (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineCalifornia Gas Transmission Co, intrastate pipeline, 1.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days370 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Condor Galaxy 1 (CG-1)Cerebras CS-2642023-11-13

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Condor Galaxy 1 (CG-1) use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

What chips does Condor Galaxy 1 (CG-1) use?

Reported chips: Cerebras CS-2.

How close is Condor Galaxy 1 (CG-1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Scott Receiving Station (115 kV), about 100 m away. The local utility is City Of Santa Clara, in the CISO balancing area.

How clean is the power for Condor Galaxy 1 (CG-1)?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates Condor Galaxy 1 (CG-1)?

G42,Cerebras Systems.

Data centers near Santa Clara

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.