conova - Datacenter 6/7 is an operational data center operated by conova communications in Hallein, Austria. Our footprint estimate of its power is about 1.6 MW.

Key facts

StatusOperational
Operatorconova communications
Facility power1.6 MW (range 0.8 MW to 2.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,333 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 680 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks, 1 internet exchanges
PeeringDB.
Also known asConova Communications
AddressSolvay-Halvic-Strasse 70
Coordinates47.70616, 13.08283
Websiteconova.com

Power and grid

Nearest high-voltage substationUmspannwerk Oberalm, 110 kV, 100 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Salzach Stich, 220 kV, 14.4 km away
HV substations within 10 km4
Power plants within 50 km440 MW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity117 g CO₂ per kWh (Austria, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6%
Industrial power priceEUR 0.150 per kWh (Austria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37 °C (2001 to 2025)
Cooling degree days30 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.25 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (Salzburg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does conova - Datacenter 6/7 use?

We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.

How close is conova - Datacenter 6/7 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Oberalm (110 kV), about 100 m away.

How clean is the power for conova - Datacenter 6/7?

The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.

Who operates conova - Datacenter 6/7?

conova communications.

Data centers near Hallein

More conova communications data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.