STACKIT Ostermiething (DC10)
STACKIT Ostermiething (DC10) is an operational data center operated by Schwarz IT KG in Ostermiething, Austria. Our footprint estimate of its power is about 7.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Schwarz IT KG |
| Facility power | 7.5 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,259 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Also known as | Rechenzentrum Ostermiething |
| Address | Weilhartstraße 92 |
| Coordinates | 48.03233, 12.83756 |
| Website | stackit.de/colocation/dc-10 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Riedersbach, 110 kV, 500 m away (Netz Oberösterreich) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Pirach, 220 kV, 14.6 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 762 MW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35 °C (2001 to 2025) |
| Cooling degree days | 124 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STACKIT Ostermiething (DC10) use?
We estimate the facility power at about 7.5 MW. Estimate from building footprint, low confidence.
How close is STACKIT Ostermiething (DC10) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Riedersbach (110 kV), about 500 m away.
How clean is the power for STACKIT Ostermiething (DC10)?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates STACKIT Ostermiething (DC10)?
Schwarz IT KG.
Data centers near Ostermiething
- Techno-Z 27.8 km
- conova - Datacenter 4/5 29.7 km
- conova - Datacenter 6/7 40.6 km · 1.6 MW
- synaforce GmbH 74.1 km · 1.6 MW
More Schwarz IT KG data centers
- STACKIT Ellhofen (DC08) Germany