STACKIT Ellhofen (DC08)
STACKIT Ellhofen (DC08) is an operational data center operated by Schwarz IT KG in Ellhofen, Germany. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Schwarz IT KG |
| Facility power | 1.7 MW (range 0.8 MW to 2.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,384 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Rechenzentrum Ellhofen |
| Address | Am AK 14 |
| Coordinates | 49.14591, 9.30796 |
| Website | stackit.de/de/colocation/dc-08 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Weinsberg, 110 kV, 2.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Heilbronn, 380 kV, 8.1 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 2.9 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 187 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.17 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STACKIT Ellhofen (DC08) use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
How close is STACKIT Ellhofen (DC08) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Weinsberg (110 kV), about 2.1 km away.
How clean is the power for STACKIT Ellhofen (DC08)?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates STACKIT Ellhofen (DC08)?
Schwarz IT KG.
Data centers near Ellhofen
- AtlasEdge DC Stuttgart NB8 42.4 km
- AtlasEdge DC Stuttgart GRP10 47.5 km
- High-Performance Computing Center Stuttgart Hawk 47.7 km · 0.2 MW
- EXA Edge DC Stuttgart 48.8 km
- ITENOS Stuttgart (STR1) 49.0 km
- SAP Building 13 49.4 km · 19 MW
- SAP Building 6 / 16 49.5 km · 8 MW
- Nepustil Stuttgart Zettachring 10a 49.6 km
More Schwarz IT KG data centers
- STACKIT Ostermiething (DC10) Austria
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.