SAP Building 13 is an operational data center in St. Leon-Rot, Germany. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
Facility power19 MW (range 9.6 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,021 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSAP-Allee 19, 68789, St. Leon-Rot
Coordinates49.24051, 8.64362

Power and grid

Nearest high-voltage substation110kV-Umspannwerk Östringen, 110 kV, 4.8 km away (Netze BW)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Wiesloch, 380 kV, 6 km away
HV substations within 10 km4
Power plants within 50 km6.6 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.5 °C (2001 to 2025)
Cooling degree days179 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.17 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does SAP Building 13 use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How close is SAP Building 13 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 110kV-Umspannwerk Östringen (110 kV), about 4.8 km away.

How clean is the power for SAP Building 13?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Data centers near St. Leon-Rot

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.