TelemaxX IPC5
TelemaxX IPC5 is an operational data center operated by TelemaxX Telekommunikation in Stutensee, Germany. Our footprint estimate of its power is about 4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TelemaxX Telekommunikation |
| Facility power | 4 MW (range 2 MW to 6.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,366 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Friedrich-List-Straße 12 |
| Opened | 2017 |
| Coordinates | 49.07772, 8.45827 |
| Website | telemaxx.de |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.17 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TelemaxX IPC5 use?
We estimate the facility power at about 4 MW. Estimate from building footprint, low confidence.
How clean is the power for TelemaxX IPC5?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates TelemaxX IPC5?
TelemaxX Telekommunikation.
Data centers near Stutensee
- Scientific Computing Center - KIT CN 2.7 km
- Scientific Computing Center 2.8 km · 1.3 MW
- TelemaxX IPC4 5.7 km · 3.3 MW
- euNetworks Colocation Karlsruhe 6.5 km · 1.4 MW
- TelemaxX IPC3 6.6 km · 1.2 MW
- POP Technologiepark Karlsruhe 6.6 km
- KIT-Bibliothek Süd 8.0 km
- Scientific Computing Center - KIT CS 8.2 km
More TelemaxX Telekommunikation data centers
- TelemaxX IPC4 Germany
- TelemaxX IPC1 Germany
- TelemaxX IPC3 Germany
- POP Technologiepark Karlsruhe Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.