euNetworks Colocation Karlsruhe
euNetworks Colocation Karlsruhe is an operational data center operated by euNetworks in Karlsruhe, Germany. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | euNetworks |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,183 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | euNetworks ColoCentre Karlsruhe |
| Address | Albert-Nestler-Strasse 7 |
| Coordinates | 49.02013, 8.44049 |
| Website | euNetworks.com |
Power and grid
| Nearest high-voltage substation | Umspannwerk Blöße, 110 kV, 800 m away (Stadtwerke Karlsruhe Netzservice GmbH) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Karlsruhe Ost, 220 kV, 1.6 km away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 4.2 GW in 34 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.17 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does euNetworks Colocation Karlsruhe use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is euNetworks Colocation Karlsruhe to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Blöße (110 kV), about 800 m away.
How clean is the power for euNetworks Colocation Karlsruhe?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates euNetworks Colocation Karlsruhe?
euNetworks.
Data centers near Karlsruhe
- POP Technologiepark Karlsruhe 77 m
- KIT-Bibliothek Süd 2.0 km
- TelemaxX IPC4 2.5 km · 3.3 MW
- Scientific Computing Center - KIT CS 2.5 km
- TelemaxX IPC3 2.7 km · 1.2 MW
- Karlsruher Institut für Technologie HoreKa 3.1 km · 0.6 MW
- TelemaxX IPC5 6.5 km · 4 MW
- TelemaxX IPC1 6.8 km · 1.3 MW
More euNetworks data centers
- euNetworks Colocation Hamburg Germany
- euNetworks Amsterdam Netherlands
- euNetworks (Global Voice) Ireland
- euNetworks Colocation Dortmund Germany
- euNetworks Colocation Bielefeld Germany
- euNetworks Colocation Bremen Germany
- euNetworks Colocation Dresden Germany
- euNetworks Colocation Erfurt Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.