euNetworks Amsterdam is an operational data center operated by euNetworks in Amsterdam, Netherlands. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatoreuNetworks
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,777 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks54 networks, 3 internet exchanges
PeeringDB.
Also known asDigital Realty
AddressPaul van Vlissingenstraat 16
Opened1956
Coordinates52.33341, 4.91942
Websiteeunetworks.nl

Power and grid

Nearest high-voltage substation150 kV Bijlmer Noord, 150 kV, 2.1 km away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Diemen, 380 kV, 6.5 km away
HV substations within 10 km21
Power plants within 50 km4.2 GW in 64 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.1 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.5 m/s average
Water stress todayLow - Medium (10-20%) (Netherlands)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does euNetworks Amsterdam use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is euNetworks Amsterdam to the power grid?

The nearest high-voltage substation in OpenStreetMap is 150 kV Bijlmer Noord (150 kV), about 2.1 km away.

How clean is the power for euNetworks Amsterdam?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates euNetworks Amsterdam?

euNetworks.

Data centers near Amsterdam

More euNetworks data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.