Equinix data center in Amsterdam-Oost
Equinix data center in Amsterdam-Oost is an operational data center operated by Equinix in Amsterdam-Oost, Netherlands. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 8.5 MW (range 4.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,067 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix AM6 · Digital Realty AMS18 |
| Opened | 1982 |
| Coordinates | 52.33689, 4.93169 |
| Website | digitalrealty.com/data-centers/emea/amsterdam/ams18 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 1.8 km away (Liander) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Diemen, 380 kV, 5.6 km away |
| HV substations within 10 km | 21 |
| Power plants within 50 km | 4.2 GW in 63 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.1 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix data center in Amsterdam-Oost use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
How close is Equinix data center in Amsterdam-Oost to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.8 km away.
How clean is the power for Equinix data center in Amsterdam-Oost?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Equinix data center in Amsterdam-Oost?
Equinix.
Data centers near Amsterdam-Oost
- Global Crossing Joop 214 m
- Equinix AM6 - Amsterdam, Duivendrechtsekade 238 m
- Digital Realty AMS18 - Amsterdam 776 m
- euNetworks Amsterdam 919 m · 11 MW
- Templus DC Amsterdam AMS01 1.0 km
- NIKHEF Amsterdam 2.5 km
- Digital Realty AMS17 - Amsterdam 2.6 km
- SURF Snellius 2.6 km · 0.7 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.