euNetworks (Global Voice)
euNetworks (Global Voice) is an operational data center operated by euNetworks in Dublin, Ireland. Our footprint estimate of its power is about 9.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | euNetworks |
| Facility power | 9.7 MW (range 4.8 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,050 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 9 networks PeeringDB. |
| Also known as | Keppel Data Centres | Keppel DC Dublin 1 · Amazon DUB-2 |
| Address | Unit 4033, Citywest Avenue, Citywest Business Park |
| Coordinates | 53.29155, -6.41623 |
| Website | globalvoice.ie |
Power and grid
| Nearest high-voltage substation | Citywest 110kV Substation, 110 kV, 300 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 3.6 km away |
| HV substations within 10 km | 29 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does euNetworks (Global Voice) use?
We estimate the facility power at about 9.7 MW. Estimate from building footprint, low confidence.
How close is euNetworks (Global Voice) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Citywest 110kV Substation (110 kV), about 300 m away.
How clean is the power for euNetworks (Global Voice)?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates euNetworks (Global Voice)?
euNetworks.
Data centers near Dublin
- Equinix Dublin DB1 68 m · 4.7 MW
- Data center in Jobstown 283 m · 9.2 MW
- Eir Hosting Services 423 m · 4.6 MW
- Eircom Dublin (Citywest) 530 m
- Equinix DB1 - Dublin, CityWest 559 m
- Dave Geoghegan 3.0 km
- Digital Realty DUB3 3.0 km · 5.8 MW
- Google 3.2 km · 5.3 MW
More euNetworks data centers
- euNetworks Colocation Hamburg Germany
- euNetworks Amsterdam Netherlands
- euNetworks Colocation Karlsruhe Germany
- euNetworks Colocation Dortmund Germany
- euNetworks Colocation Bielefeld Germany
- euNetworks Colocation Bremen Germany
- euNetworks Colocation Dresden Germany
- euNetworks Colocation Erfurt Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.