Data center in Jobstown
Data center in Jobstown is an operational data center in Jobstown, Ireland. Our footprint estimate of its power is about 9.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.2 MW (range 4.6 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,626 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.29358, -6.41368 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 500 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 3.5 km away |
| HV substations within 10 km | 30 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Jobstown use?
We estimate the facility power at about 9.2 MW. Estimate from building footprint, low confidence.
How close is Data center in Jobstown to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 500 m away.
How clean is the power for Data center in Jobstown?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Data centers near Jobstown
- Equinix Dublin DB1 241 m · 4.7 MW
- Eir Hosting Services 250 m · 4.6 MW
- euNetworks (Global Voice) 283 m · 9.7 MW
- Eircom Dublin (Citywest) 321 m
- Equinix DB1 - Dublin, CityWest 464 m
- Digital Realty DUB3 2.9 km · 5.8 MW
- Dave Geoghegan 2.9 km
- Amazon Web Services 3.1 km · 13 MW