Eircom Dublin (Citywest)
Eircom Dublin (Citywest) is an operational data center operated by eircom in Dublin, Ireland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | eircom |
| Networks | 4 networks PeeringDB. |
| Address | Unit 4050, Kingswood Avenue, CityWest Business Park |
| Coordinates | 53.29629, -6.41538 |
| Website | eir.ie |
Power and grid
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Eircom Dublin (Citywest)?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Eircom Dublin (Citywest)?
eircom.
Data centers near Dublin
- Eir Hosting Services 112 m · 4.6 MW
- Equinix DB1 - Dublin, CityWest 238 m
- Data center in Jobstown 321 m · 9.2 MW
- Equinix Dublin DB1 519 m · 4.7 MW
- euNetworks (Global Voice) 530 m · 9.7 MW
- Digital Realty DUB3 2.6 km · 5.8 MW
- Google 2.9 km · 5.3 MW
- Equinix DB2 - Dublin, Kilcarbery 3.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.