Eir Hosting Services
Eir Hosting Services is an operational data center operated by Eir in Citywest, Ireland. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Eir |
| Facility power | 4.6 MW (range 2.3 MW to 7.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,850 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Kingswood Avenue 4050, D24 YX53, Citywest |
| Coordinates | 53.29535, -6.41600 |
Power and grid
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Eir Hosting Services use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
How clean is the power for Eir Hosting Services?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Eir Hosting Services?
Eir.
Data centers near Citywest
- Eircom Dublin (Citywest) 112 m
- Equinix DB1 - Dublin, CityWest 224 m
- Data center in Jobstown 250 m · 9.2 MW
- Equinix Dublin DB1 418 m · 4.7 MW
- euNetworks (Global Voice) 423 m · 9.7 MW
- Digital Realty DUB3 2.7 km · 5.8 MW
- Google 2.9 km · 5.3 MW
- Equinix DB2 - Dublin, Kilcarbery 3.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.