Data center in Barra da Tijuca is an operational data center in Barra da Tijuca, Brazil. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.6 MW (range 2.3 MW to 7.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,849 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -22.98855, -43.44090 |
Power and grid
| Nearest high-voltage substation | Subestação Itapeba, 138 kV, 1.6 km away (Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Jacarepaguá, 345 kV, 7.4 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 3.4 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 23.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 2,017 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.71 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Low (<10%) (Rio de Janeiro) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Barra da Tijuca use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
How close is Data center in Barra da Tijuca to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Itapeba (138 kV), about 1.6 km away.
How clean is the power for Data center in Barra da Tijuca?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Data centers near Barra da Tijuca
- Tecto TGIG1 (ex Globenet CLS RJ) 525 m
- Takoda RJ01 1.2 km
- NDX NET Servicos de Informatica 5.4 km
- Rio AI City 7.1 km · 69 MW
- Nextel MSO RJO 15.3 km
- NEXUS RJ01 21.0 km
- Equinix RJ2 - Rio de Janeiro 21.6 km · 11 MW
- Scala Data Centers SGIGSM01 22.8 km