Data Center Directory

Data center in Bet Shemesh

Data center in Bet Shemesh is an operational data center in Bet Shemesh, Israel. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
Facility power17 MW (range 8.6 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,342 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates31.77179, 34.99240

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 2.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationתחנת מיתוג, 400 kV, 12.2 km away
HV substations within 10 km4
Power plants within 50 km9.7 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity493 g CO₂ per kWh (Israel, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 79.7%, solar 16.2%, coal 3.4%, wind 0.6%. Clean power: 16.9%

Climate and water

Average temperature19.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days1,460 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.47 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayExtremely High (>80%) (Jerusalem)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Bet Shemesh use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Data center in Bet Shemesh to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 2.1 km away.

How clean is the power for Data center in Bet Shemesh?

The grid in Israel emits about 493 g CO₂ per kWh (2025). Largest sources: gas 79.7%, solar 16.2%, coal 3.4%.

Data centers near Bet Shemesh

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.