Data center in Bet Shemesh is an operational data center in Bet Shemesh, Israel. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 17 MW (range 8.6 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,342 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.77179, 34.99240 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 161 kV, 2.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | תחנת מיתוג, 400 kV, 12.2 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 9.7 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 493 g CO₂ per kWh (Israel, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 79.7%, solar 16.2%, coal 3.4%, wind 0.6%. Clean power: 16.9% |
Climate and water
| Average temperature | 19.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.5 °C (2001 to 2025) |
| Cooling degree days | 1,460 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.47 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Extremely High (>80%) (Jerusalem) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Bet Shemesh use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Data center in Bet Shemesh to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 2.1 km away.
How clean is the power for Data center in Bet Shemesh?
The grid in Israel emits about 493 g CO₂ per kWh (2025). Largest sources: gas 79.7%, solar 16.2%, coal 3.4%.
Data centers near Bet Shemesh
- NVIDIA Israel-1 16.5 km · 2.9 MW
- SDS1 Modiin 16.5 km
- רד תקשורת מחשבים 21.1 km · 6 MW
- Partner Rehovot DataCenter 23.4 km
- MTIT Building 01 26.5 km
- Data center in Shoham 27.8 km · 9.1 MW
- Bezeq International Shacham Data Center 37.0 km
- Bezeq International Afek Data Center 37.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.