NVIDIA Israel-1
NVIDIA Israel-1 is an operational AI data center operated by Nvidia in Mazkeret Batya, Israel. Its power is about 2.9 MW. Epoch AI estimates about 2,048 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Nvidia |
| Facility power | 2.9 MW Reported (Epoch AI or owner data) |
| AI compute | 2,048 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 2,048 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Israel |
| Coordinates | 31.84726, 34.84200 |
Power and grid
| Nearest high-voltage substation | תה"ר נען, 161 kV, 1.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 10.2 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 9.8 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 493 g CO₂ per kWh (Israel, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 79.7%, solar 16.2%, coal 3.4%, wind 0.6%. Clean power: 16.9% |
Climate and water
| Average temperature | 19.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.5 °C (2001 to 2025) |
| Cooling degree days | 1,460 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.47 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Extremely High (>80%) (Israel) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NVIDIA Israel-1 Phase 1 | NVIDIA H100 SXM5 80GB | 1,024 | 1.5 MW | 2023-11-23 |
| NVIDIA Israel-1 Phase 2 | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2024-11-20 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NVIDIA Israel-1 use?
Public data puts the facility power at about 2.9 MW. Reported (Epoch AI or owner data).
What chips does NVIDIA Israel-1 use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is NVIDIA Israel-1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is תה"ר נען (161 kV), about 1.5 km away.
How clean is the power for NVIDIA Israel-1?
The grid in Israel emits about 493 g CO₂ per kWh (2025). Largest sources: gas 79.7%, solar 16.2%, coal 3.4%.
Who operates NVIDIA Israel-1?
Nvidia.
Data centers near Mazkeret Batya
- Partner Rehovot DataCenter 7.7 km
- SDS1 Modiin 13.8 km
- Data center in Bet Shemesh 16.5 km · 17 MW
- Data center in Shoham 22.3 km · 9.1 MW
- Bezeq International TLV Data Center 23.5 km
- EdgeConneX Tel Aviv (EDCTLV01) 23.8 km
- Bezeq International Shacham Data Center 26.4 km
- Bezeq International Sivim Data Center 26.8 km
More Nvidia data centers
- NVIDIA Selene United States
- NVIDIA Taipei-1 Taiwan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.