NVIDIA Taipei-1
NVIDIA Taipei-1 is an operational AI data center operated by Nvidia in Kaohsiung, Taiwan. Its power is about 0.9 MW. Epoch AI estimates about 559 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB, NVIDIA L40).
Key facts
| Status | Operational |
|---|---|
| Operator | Nvidia |
| Facility power | 0.9 MW Reported (Epoch AI or owner data) |
| AI compute | 559 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB, NVIDIA L40 Reported (Epoch AI or owner data) |
| Chip count | 768 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Kaohsiung Software Technology Park No. 10號, Fusing 4th Rd, Cianjhen District, Kaohsiung City, Taiwan 806 |
| Coordinates | 22.60470, 120.29951 |
Power and grid
| Nearest high-voltage substation | 高雄超高壓變電所, 345 kV, 4.7 km away (台灣電力公司) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 8.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 634 g CO₂ per kWh (Taiwan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.8%, coal 36.1%, solar 5.5%, wind 4.2%, hydro 1.9%. Clean power: 13.5% |
Climate and water
| Average temperature | 24.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.1 °C (2001 to 2025) |
| Cooling degree days | 2,542 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.58 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NVIDIA Taipei-1 | NVIDIA H100 SXM5 80GB + NVIDIA L40 | 768 | 0.9 MW | 2024-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NVIDIA Taipei-1 use?
Public data puts the facility power at about 0.9 MW. Reported (Epoch AI or owner data).
What chips does NVIDIA Taipei-1 use?
Reported chips: NVIDIA H100 SXM5 80GB, NVIDIA L40.
How close is NVIDIA Taipei-1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 高雄超高壓變電所 (345 kV), about 4.7 km away.
How clean is the power for NVIDIA Taipei-1?
The grid in Taiwan emits about 634 g CO₂ per kWh (2025). Largest sources: gas 48.8%, coal 36.1%, solar 5.5%.
Who operates NVIDIA Taipei-1?
Nvidia.
Data centers near Kaohsiung
- 中華電信台南營運處第二客戶網路中心 42.3 km · 1.4 MW
- CHT Tainan YongKong IDC 46.8 km
- NCHC Tainan 55.2 km
More Nvidia data centers
- NVIDIA Selene United States
- NVIDIA Israel-1 Israel
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.