NVIDIA Selene is an operational AI data center operated by Nvidia in Santa Clara, United States. Its power is about 4.7 MW. Epoch AI estimates about 1,413 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorNvidia
Facility power4.7 MW
Reported (Epoch AI or owner data)
AI compute1,413 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count4,480
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 2,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSanta Clara, California
Coordinates37.35231, -121.96190

Power and grid

Nearest high-voltage substationScott Receiving Station, 115 kV, 2.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorthern Receiving Station, 230 kV, 5.5 km away
HV substations within 10 km23
UtilityCity Of Santa Clara (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineCalifornia Gas Transmission Co, intrastate pipeline, 4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days370 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
NVIDIA Selene Phase 1NVIDIA A1002,2402.4 MW2020-06-22
NVIDIA Selene Phase 2NVIDIA A1004,4804.7 MW2020-11-30

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does NVIDIA Selene use?

Public data puts the facility power at about 4.7 MW. Reported (Epoch AI or owner data).

What chips does NVIDIA Selene use?

Reported chips: NVIDIA A100.

How close is NVIDIA Selene to the power grid?

The nearest high-voltage substation in OpenStreetMap is Scott Receiving Station (115 kV), about 2.8 km away. The local utility is City Of Santa Clara, in the CISO balancing area.

How clean is the power for NVIDIA Selene?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates NVIDIA Selene?

Nvidia.

Data centers near Santa Clara

More Nvidia data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.