Microsoft
Microsoft is an operational data center operated by Microsoft in Santa Clara, United States. Our footprint estimate of its power is about 26 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 26 MW (range 13 MW to 42 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,775 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lafayette Street 2055, Santa Clara |
| Coordinates | 37.36210, -121.94646 |
Power and grid
| Utility | City Of Santa Clara (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 3.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
What chips does Microsoft use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Microsoft?
Microsoft.
Data centers near Santa Clara
- Vantage Santa Clara CA2 215 m · 16 MW
- Digital Realty SJC (2220 De La Cruz Blvd) 240 m · 60 MW
- STACK SVY02 643 m · 12 MW
- NTT Silicon Valley data center campus 1.1 km · 1.4 MW
- EdgeConneX Santa Clara (EDCSVC01/EDCSVC02) 1.1 km · 5.4 MW
- Digital Realty SJC (2805 Lafayette) 1.2 km · 16 MW
- Bay Area Internet 1.4 km · 18 MW
- Prime Santa Clara 1.5 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.