Data center in Blanchardstown
Data center in Blanchardstown is an operational data center in Blanchardstown, Ireland. Our footprint estimate of its power is about 33 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 33 MW (range 17 MW to 53 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,559 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.40695, -6.36260 |
Power and grid
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Blanchardstown use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Blanchardstown?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Data centers near Blanchardstown
- Keppel Data Centres | Keppel DC Dublin 2 277 m
- K2 DUB1 290 m · 3.8 MW
- Data center in Blanchardstown 306 m · 13 MW
- Amazon Web Services 369 m · 16 MW
- Equinix 556 m · 8.5 MW
- Digital Realty Dublin DUB10 632 m
- Digital Realty DUB10 792 m · 20 MW
- Data center in Blanchardstown 794 m · 10 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.