K2 DUB1 is an operational data center operated by K2 Data Centres in Blanchardstown, Ireland. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | K2 Data Centres |
| Facility power | 3.8 MW (range 1.5 MW to 9.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 31,706 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ballycoolin Business Park, K2 Ballycoolin Dublin Campus |
| Coordinates | 53.40713, -6.35823 |
| Website | k2datacentres.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 100 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 1.4 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does K2 DUB1 use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is K2 DUB1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 100 m away.
How clean is the power for K2 DUB1?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates K2 DUB1?
K2 Data Centres.
Data centers near Blanchardstown
- Data center in Blanchardstown 259 m · 13 MW
- Data center in Blanchardstown 290 m · 33 MW
- Keppel Data Centres | Keppel DC Dublin 2 430 m
- Data center in Blanchardstown 503 m · 10 MW
- Amazon Web Services 518 m · 16 MW
- Equinix DB4 - Dublin, Ballycoolin 669 m · 5.2 MW
- Digital Realty Dublin DUB10 786 m
- Equinix 841 m · 8.5 MW
Sources