Data center in Cimarron Hills
Data center in Cimarron Hills is an operational data center in Cimarron Hills, United States. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,169 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Irwin Avenue 600 |
| Coordinates | 38.80267, -104.52198 |
Power and grid
| Nearest high-voltage substation | Horizon Substation, 230 kV, 12.9 km away (Colorado Springs Utilities) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | Mountain View Elec Assn, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WACM |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 15.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.7 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 392 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Cimarron Hills use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is Data center in Cimarron Hills to the power grid?
The nearest high-voltage substation in OpenStreetMap is Horizon Substation (230 kV), about 12.9 km away. The local utility is Mountain View Elec Assn, INC, in the WACM balancing area.
How clean is the power for Data center in Cimarron Hills?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Data centers near Cimarron Hills
- T5@Colorado Springs 23.2 km · 11 MW
- Data102 - COS01 26.4 km
- Walmart Colorado Data Center 30.7 km · 35 MW
- SAP COS02 30.9 km · 8.1 MW
Sources
Correct this page or get the data