SAP COS02
SAP COS02 is an operational data center operated by SAP in Air Force Academy, United States. Our footprint estimate of its power is about 8.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SAP |
| Facility power | 8.1 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,760 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.98892, -104.78633 |
Power and grid
| Nearest high-voltage substation | Kettle Creek Substation, 115 kV, 200 m away (Colorado Springs Utilities) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cottonwood Substation, 230 kV, 5.3 km away |
| HV substations within 10 km | 6 |
| Utility | City Of Colorado Springs (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WACM |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.7 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.8 °C (2001 to 2025) |
| Cooling degree days | 152 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SAP COS02 use?
We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.
How close is SAP COS02 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kettle Creek Substation (115 kV), about 200 m away. The local utility is City Of Colorado Springs, in the WACM balancing area.
How clean is the power for SAP COS02?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates SAP COS02?
SAP.
Data centers near Air Force Academy
- Walmart Colorado Data Center 363 m · 35 MW
- Data102 - COS01 17.7 km
- T5@Colorado Springs 22.6 km · 11 MW
- Data center in Cimarron Hills 30.9 km · 3.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.