Data center in Clondalkin
Data center in Clondalkin is an operational data center in Clondalkin, Ireland. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,607 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.31719, -6.44428 |
Power and grid
| Nearest high-voltage substation | Kilcarbery Substation, 110 kV, 300 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 400 m away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Clondalkin use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is Data center in Clondalkin to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kilcarbery Substation (110 kV), about 300 m away.
How clean is the power for Data center in Clondalkin?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Data centers near Clondalkin
- Digital Realty Dublin DUB13-14 254 m · 4.1 MW
- Microsoft DUB13 314 m · 12 MW
- Equinix DB2 - Dublin, Kilcarbery 329 m
- Digital Realty DUB3 440 m · 5.8 MW
- Google 447 m · 5.3 MW
- Data center in Clondalkin 473 m · 21 MW
- Google 525 m · 29 MW
- Microsoft DSF 537 m · 9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.